QUALITY CONTROL SYSTEM
01. QUALITY CONTROL POLICY:

In DASTAGIR APPARELS (PVT.) LTD.  responsibilities for ensuring proper quality are as follows:

A) FACTORY: The primary responsibility lies with the factory where garments are made. Factory quality control staffs will ensure proper quality as per laid down quality control system.
B) Quality control staffs working directly under chief operating officer will closely monitor quality of the factory production. In case of any quality problem they will report to the concerned and corrective action is taken accordingly.
02. QUALITY CONTROL SYSTEM:

Quality control system is followed by all in the group from piece goods inspection to final statistical audit.

A) PIECE GOODS QUALITY CONTROL:

On receipt of piece goods in the ware house at least 10% is inspected as per "four points" system as under.

SIZE OF DEFECT PENALTY
3 INCHES OF LESS 1 POINT
OVER 3, UNDER 6 INCHES 2 POINTS
OVER 6, UNDER 9 INCHES 3 POINTS
OVER 9 INCHES 4 POINTS

A maximum of four points are charged to one linear yard. Only passed piece goods are issued to the cutting floor.
B) CUTTING QUALITY CONTROL:

In cutting section quality control is ensured in two stages.

I) SPREADING QUALITY CONTROL:

Following points are checked during spreading.

A) TABLE MARKING
B) ENDS
C) TENSION
D) LEANING
E) NARROW GOODS
F) COUNTS
G) PLY HEIGHT
H) REMNANTS
I) FABRIC FLAWS
J) MARKER PLACING
II) AFTER CUTTING QUALITY CONTROL:

After each cutting seven blocks and bundles are selected at random checked based on acceptable quality level (aql) 2.5 on the flowing points.

A) MIS CUT
B) RAGGED CUTTING
C) PATTERN CHECKS
D) MATCHING PLIES
E) NOTCHES
03. IN PROCESS QUALITY CONTROL (SEWING):

During sewing "in process quality control" is done by selecting seven pieces at random from a completed bundle (maximum 180 pcs) after checking bundle will be passed for zero defect based on aql 2.5 in case one or more defects are found in seven pcs whole bundle will be sent to concerned supervisor for rechecking.
04. QUALITY CONTROL IN FINISHING SECTION:

Following inspection/audit are done to attain aql 4.0

A) PROCESS INSPECTION:

Garments are checked process wise at the initial stage of finishing.
B) TWO-HOURLY AUDIT:

Every after two-hour’s statistical audit is done on finishing lot as per table “a” to attain aql 2.5.
C) DAYS FINAL AUDIT:

At the end of the day accumulated lot of finished garments are statistically audited as per table “a” to attain aql 2.5.
D) FINAL AUDIT:

On completion of finishing a particular lot of garments before buyer’s inspection factory quality control manger conducts statistical audit as per table “a” based on aql 2.5. This way garments can easily be passed during buyers inspection based on aql 4.0.